Client: Times Energy Pvt. Ltd.
Project Cost: 53,095,603.80 with VAT
Location: Salleri & Dobhan, Gorkha
Service: Geotechnical Investigation
Date of Agreement: April 27, 2025
Date of Completion: February 10, 2026
Major Component of BGHEP (341MW)
Annex:
Table 1: Summary of Drill Holes of Headworks Area
Borehole No. | Location | Drill Orientation | Drill Depth, m |
Elevation, m |
Trend |
Plunge |
NDH-1 | Right bank intake abutment | vertical | 62 | 1300.11 |
| -90 ° |
NDH-2 | Dam axis, right bank | inclined | 65 | 1300 |
| -75 ° |
NDH-3.a | Terrace deposits, Upstream of Diversion Tunnel Inlet portal area, left bank | vertical | 51 | 1323.16 |
| -90 ° |
NDH-3.b | Terrace deposits, Upstream of Diversion Tunnel Inlet portal area, left bank | vertical | 96.5 | 1338.45 |
| -90 ° |
NDH-3.c | Floodplain, Upstream of Diversion Tunnel Inlet portal area | vertical | 105 | 1309 |
| -90 ° |
NDH-04 | Dam right abutment, downstream apron | inclined | 65 | 1302.76 | N74.3̊E | -75 ° |
NDH-05 | Dam right abutment, downstream apron | Vertical | 94 | 1299.91 |
| -90 ° |
NDH-6 | Dam right abutment | inclined | 100 | 1310 | N164°E | -50 ° |
NDH-07 | Upstream of Dam, left bank, near diversion inlet portal | Inclined | 100 | 1301.06 | N165̊ E | -75 ° |
NDH-08A | Upstream apron of Dam | Vertical | 40.50 | 1300.62 |
| -90 ° |
NDH-08 | Upstream apron of Dam | Vertical | 93
| 1300.66 |
| -90 ° |
NDH-09 | Upstream right bank | Vertical | 64 | 1302.60 |
| -90 ° |
NDH-10 | Upstream cut-off wall, right abutment | vertical | 45 | 1306.33
|
| -90° |
NDH-11 | Upstream of Dam, left bank, near diversion inlet portal | Vertical | 45 | 1301.22 |
| -90 ° |
NDH-12 | Upstream in the middle of river | Vertical | 62 | 1301.72 |
| -90 ° |
NDH-14 | Dam Footprint right bank | Inclined | 20 | 1300.78 | N74̊E | -50° |
NDH-14A | Dam Footprint right bank | Inclined | 57 | 1300.66 | N74̊E | -50° |
NDH-15 | Dam footprint right bank | Inclined | 61.50 | 1301.25 | N74̊E | |
NDH-16 | Dam footprint right bank | Inclined | 45 | 1300.29 | N254̊E | -70° |
Borehole No. |
Location | Drill Orientation | Drill Depth, m |
Elevation,m |
Trend |
Plunge |
NDB-01 | Near Powerhouse, kholsi crossing | vertical | 150 | 1093.85 |
| -90 ° |
NDB-02 | New Tailrace alignment (toward hill side) | vertical | 62 | 1212.09 |
| -90 ° |
NDB-03 | Main access tunnel (upstream) | inclined | 130 | 1048.37 | N310°E | -70 ° |
NDB-4 | Main access tunnel (upstream) | inclined | 95 | 1048.37 | N18°E | -40 ° |
TabTable 2: Summary of Drill Holes of Powerhouse Area
Borehole No. |
Location | Drill Orientation | Length m |
Elevation,m |
Trend |
Plunge |
NDB-05 | HRT-Power House Site | Vertical | 150 | 1376.02 |
| -90 ° |
Table 3: Summary of drill Hole of Head Race Tunnel
© 2022 SS Consult All rights reserved. Managed by Code Space