Nepal is prone to a range of natural disasters, including floods, landslides, fires, earthquakes, and disease outbreaks. In the wake of recent tragedies in the country, including the massive 2015 Gorkha earthquake, USAID introduced Tayar Nepal activity. Tayar Nepal is USAID’s flagship disaster preparedness and response project for Nepal. Tayar—which means “prepared”—strengthens the capacity of Nepal’s disaster risk management (DRM) and preparedness institutions. At the national level USAID’s Tayar Nepal builds the capacity of disaster risk reduction and management (DRRM) institutions, which includes Ministry of Federal Affairs (MoFAGA), Ministry of Home Affairs (MoHA), National Disaster Risk Reduction and Management Authority (NDRRMA). At the municipal level, USAID’s Tayar Nepal’s interventions support municipalities to
fulfill their DRM roles in the broader federal disaster management system by building capacity in preparedness, response, and helping them understand and address the risks that face their constituents. In USAID’s Tayar Nepal Project Year 5 Annual Work Plan, USAID’s Tayar Nepal Project has identified a potential disaster mitigation intervention in Rajapur municipality. USAID’s Tayar Field team in consultation with the municipal government identified priority projects that USAID’s Tayar Nepal will provide financial and technical assistance to, including construction oversight during implementation. USAID’s Tayar Nepal will support following major disaster mitigation projects in the Rajapur municipality:
Detailed Design, Construction and Supervision works for Riverbank Protection Project, Budhi Kulo, Dhobinpur Ward 8 and Muktakamaiya tole, Ward 4
Activities Performed;
1.Conducted detailed engineering surveys (topographic, hydrological and geological / geotechnical) and provide detailed survey reports, feasibility reports, design drawings, estimate of works, and BOQ, incorporating environmental and social aspects of the DRR mitigation project.
2.Provided regular monitoring of the designed construction project to ensure the infrastructure projects are implemented with high standards with regards to the quality, the expectation of USAID’s Tayar Nepal, USAID Nepal, and the municipalities, and is in compliance with the agreed construction designs, drawing, BOQ, technical specifications, environmental mitigation plan, health and safety measures, timeline, and other related construction requirements such as safeguard policy.