Project Cost: $42,900
Location: Kathmandu, Lalitpur
Service: Urban Development
Date of Agreement: March 2025
Date of Completion: May 2026
International Firm: Groupe Huit
Major Components (Overview)
Objective and Purpose of the Assignment (Details)
The objective of the Assignment was to review the existing design of UN Park and to finalize, based on the site plan and the architectural design, engineering design, the hydraulic design and the bill of quantities and cost estimates in the center of Kathmandu, whilst complying with ADB safeguard requirements.
The existing design failed to integrate the park with the surrounding river system and did not account for the annual flooding it experiences. The extensive use of concrete and civil works decreases soil permeability, compromising flood management capabilities. Consequently, landscaped areas and equipment were at high risk of damage during annual floods, leading to significant operational and maintenance costs. Additionally, the design did not align with the park's existing characteristics and natural features.
Following a co-design approach, a new site plan has been developed, and architectural design has been finalized. Operation and management issues have also been discussed. Surveys have been carried out to determine the layout of the sewage and drainage system, as well as soil composition. These consultations and surveys are considered in the proposed site plan and architectural design for UN Park. The design review ensured to design a resilient, sustainable, and functional landscape for UN Park in Kathmandu, integrating nature-based solutions to mitigate flood risks, enhance biodiversity, and foster community engagement while preserving its role as a vital urban green space.